The definition of a changeover is the compression of product “A’s” last tablet, to the compression of the first tablet of product “B”:
- Typical tablet press utilization PRIOR TO the incorporation of quick changeover techniques
- Holidays: operated at 4% utilization
- Maintenance: 4% of the time
- Changeovers: 28% of the time
- Production: 64% utilization
- Typical tablet press utilization AFTER the incorporation of quick changeover techniques
- Holidays: operated at 4% utilization
- Maintenance: 4% of the time
- Changeovers: 17% of the time; 11% reduction in changeover time
- Production: 75% utilization; 11% increase in production time from that tablet press
- Factors involved in this case study included the following
- Labor hours
- Cycle time
- Scheduling
- Equipment
- Training
- Extra parts
- Steps involved included
- 1st step: press diassembly
- 2nd step: tool and die removal
- 3rd step: die table cleaning
- 4th step: press body cleaning
- 5th step: disassemble and clean parts
- 6th step: reassemble parts
- 7th step: install cams, tools, and dies
- 8th step: assemble press
- Ask yourself the following questions?
- HOW do changeovers impact our operation?
- Do we have changeover standards?
- ARE we tracking performance vs. our standards?
- DO we have consistency in our changeovers?
- IF changeover reduction is our goal, where do we begin?
- Do’s and don’ts before you get started
- DO evaluate your process and identify problem areas
- DON’T make any conclusion until factual data is compiled
- Map out a proces to achieve your goal(s)
- Identify rate limiting steps
- Analyze the rate limiting steps and explore alternatives
- Optimize through procedure change, and/or equipment modification or acquisition
- Look for opportunities to perform concurrent activities
- Long cycle time disadvantages
- Press is not running production, or, not making the company any money
- Equipment utilization is down
- Impacts the plant’s throughput
- Disassembling the press
- Initial press cleanup: vacuum excess granulation; quick wipe surfaces prior to disassembly; blow with compressed air
- Utilize wash-in-place technology (WIP): it features sealed bearings; minimal electrical components in compression chamber; stainless steel
- WIP advantages: reduces cleaning time; allows for minimal exposure
- Disassembly: utilize quick disconnect components where ever possible; remove machine guarding; hrouds, pipes, hoppers, feeders, etc.; and any ancillary parts of the machine that have to be removed
- Tool and die removal
- Remove: upper and lower tools, dies, and cams if required
- Externalize: any die table service
- Removing the die table enables easier die table cleaning, cam removal and installation
- Exchangeable die table adds flexibility; and enables the tool and die work to be done outside of the critical path or cycle time
- Disassemble and parts cleaning
- Disassemble feeding assemblies, de-dusting units, hoppers, etc.
- Wash and dry parts: hand wash parts and dry by air dry, towel dry, or using compressed air
- Load parts into washing baskets, and use an automated parts cleaner and dryer, if possible
- Reassembling the press
- Reassemble all change parts and the complete press
- If possible: try and have an extra set of parts available